Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2021-10-21 09:13
69
Company Profile
Ruian Take Off Machinery Co., LtdBy certification [File Integrity]
Contact: qifei(Mr.)
Email:
Telephone:
Phone:
Area: Zhejiang
Address: Zhejiang
Website: http://www.takeoff-machinery.com/ http://qifei.hetianchem.com/
Capacity:
1.Single roll unwinding : 1.5 ream/min (900 ream/day)(2.25 ton paper/day)
2.Double roll unwinding : 3 ream/min (1800 ream/day)(4.5 ton paper/day)
3.Four roll unwinding:6 ream/min(3600 ream/day)(9 ton paper/day)
Technical Parameter
Model |
TO-1100 |
The max jumbo roll diameter |
φ1400mm |
The max jumbo roll width |
1100mm |
Cutting length |
20-1200mm,A3,A4 |
Speed |
20-200 times/min |
Material GSM |
40-450gsm |
Precision |
±0.2mm |
Feeding Roll |
One Rolls |
Capacity |
1.5 bags/min |
Power |
9.5KW |
Voltage |
380V/50HZ(Other can be customize) |
Weight |
4500kg |
Dimension(L×W×H) |
6200×3300×1400 |
Automatic sheet stacking system with pallet.
Fully automatic sheet stacker that can accommodate 2 pallets next to each other
Equipped with a jogging system at the front of the stack and at both sides to square the stack on the pallet
An additional separator can be mounted in the middle of the 2 stacks .
The system has to follow the stack height automatically.
Our New technology about the slitting cutter change:we must disassembly the Active and passive axes before change the
Slitting cutter,this new design can solve this troublesome operation.
Solution:A quick-change cutter structure of a slitting machine, including 1, 2 installed on the 1, and a
Including the 3, 4, 6, 15 is installed on the 3, the 5 is installed on the 4, and the driven shaft is
4 can be rotatably installed on one end of the 7, the other end of the 7 is fixedly installed on the 6, and the 6 and the worm gear reduce
The output shaft of the9 is linked, the input shaft of 9 is installed with 8, and 9 is fixedly installed on the wall.
On the plate 2, the 3 and 4 are linked through the 16, and 17 is installed on one of 2 to pair the main shaft.
http://www.takeoff-machinery.com/